Connect
PROJECT DETAILS
WE BUILD THINGS DIFFERENTLY
Project for the Construction of Sewage and Water Lines in Masharif, Alexandria
CLIENT:
General Authority for Roads,Briges and land Transport
Scope of Work:
The project involves the development of the infrastructure, including:
- A 630 mm diameter G.R.P water line with a total length of 23 km.
- A 315 mm diameter G.R.P water line with a total length of 13 km.
- A 700 mm diameter polyethylene corrugated sewage network with a total length of 4.5 km.
- A water drainage system (deep wells and well points).
This work will provide essential utility infrastructure for the Masharif area in Alexandria.
4o mini
The project also covers the construction of a potable water lift station in New Aswan City.
The works will utilize pipes made of U.P.V.C, HDPE, GRP, and concrete materials.
The total length of the sewage and water networks is 69,000 linear meters.
Project Duration:
18 months