Construction works for the Borg El Arab 2 water pipeline, including polyethylene pipes, tunnel jacking works

Execution of infrastructure works, including the construction of a 1,400 mm diameter twin water pipeline in Alamein

The Central Passenger Station in Al-Ayat City, part of the High-Speed Electric Train Project (Blue Line)

Helwan Commercial Mall in the Helwan area, Cairo Governorate, with a surface area of 11,000m2

The “the Club Club” in Sheraton, Cairo Governorate, spans an area of 12.5 acres and includes several buildings:

Project for the Construction of Sewage and Water Lines in Masharif, Alexandria

Implementation of water pipelines using polyethylene pipes with diameters of 800, 560

development of industrial zone – east port said
Infrastructure Works in the East Port Said Industrial Zone, covering an area of 1,100,000 square meters.

Construction of the new building at the Oncology Center, Mansoura University, in Mansoura Governorate

The Cairo Security Directorate project covers a land area of 40,000m2 and consists of five security buildings, a two-level parking garage and four additional floors with a

The Aswan Security Directorate project covers a land area of 20,000 square meters and consists of four security buildings,

Construction works of a sewage pumping station B in the RAVEL project in the Fifth Settlement area

Construction works for the East Port Said Naval Base on an area of 1,680,000 square meters.

The development of Al-Fustat Gardens in the Masr El-Qadima district of Cairo Governorate

Implementation of intersections for the High-Speed Electric Train Project, Section Three (from West of the Nile to Alamein)

onstruction of the Egypt-Japan University of Science and Technology