Connect
PROJECT DETAILS
WE BUILD THINGS DIFFERENTLY
Execution of infrastructure works, including the construction of a 1,400 mm diameter twin water pipeline in Alamein, intersecting with the route of the first high-speed electric train line (Ain Sokhna – Alexandria – Alamein – Matrouh). Total length: 18 km. Additionally, a 315 mm diameter water pipeline with a total length of 27 km will be constructed.
Project Duration:
18 months
Client:
General Authority for Roads ,Briges and land Transport.
No comment