The project of establishing the water line in Borg Al- Arab 2, Diameter 1200mm

Follow

PROJECT DETAILS

WE BUILD THINGS DIFFERENTLY

Construction works for the Borg El Arab 2 water pipeline, including polyethylene pipes, tunnel jacking works, and mechanical works for valve chambers with a diameter of 1200 mm, intersecting with the path of the first high-speed electric train line (Ain Sokhna – Alexandria – Alamein – Matrouh – Fayoum), totaling 47.5 km

CLIENT:

General Authority for Roads, Bridges and land Transport.

Project Duration:

24 months