Construction works for the Borg El Arab 2 water pipeline, including polyethylene pipes, tunnel jacking works, and mechanical works for valve chambers with a diameter of 1200 mm, intersecting with the path of the first high-speed electric train line (Ain Sokhna – Alexandria – Alamein – Matrouh – Fayoum), totaling 47.5 km
CLIENT:
General Authority for Roads, Bridges and land Transport.
Project Duration:
24 months